Question 1Which three phases group the seven steps of the AIAG-VDA FMEA?
Question 2What do the 5T of step 1 stand for?
Question 3A project manager wants the PFMEA started only after the production tooling is delivered, 'so we know what the process really is'. What is the main problem?
Question 4Your plant builds a new bracket very close to an existing family of brackets. Which way of starting the PFMEA fits the handbook approach best?
Question 5In a DFMEA structure tree, where are failure causes usually found?
Question 6A team lists 'the copper wire' as a 4M work element of the crimping step. What is the best comment?
Question 7An auditor finds that the PFMEA uses step numbers 10, 20, 30 while the control plan uses A, B, C and the process flow has no numbers. What is the risk?
Question 8Which is the best way to write a function in step 3?
Question 9On a P-diagram for a door seal, the team lists 'car wash brushes and cold weather'. In which part of the diagram do these belong?
Question 10In a PFMEA, the function of the work element 'operator' at a press step is left blank. Why does this matter?
Question 11In the failure chain, what is the failure mode?
Question 12A PFMEA team writes the failure effect only as 'scrap in our plant' for a missing weld nut, although the nut holds a seat bracket in the car. What is wrong?
Question 13Which failure cause is written in a way the team can act on?
Question 14When the team moves down the tree and the worm gear becomes the focus element, what happens to 'worm gear tooth wear'?
Question 15Why does the AIAG-VDA handbook replace the RPN with Action Priority?
Question 16A plant adds a 100% end-of-line camera check for a missing clip. Which rating should this control change?
Question 17A failure effect could make the driver suddenly lose steering control while driving. Which severity range does the handbook reserve for this kind of effect?
Question 18A chain is rated AP High. The team believes the current controls are enough and plans no action. What does the handbook expect?
Question 19Which action is most likely to reduce the risk of a terminal fitted in the wrong cavity?
Question 20Management decides not to fund a recommended design change. What should the FMEA record?
Question 21What belongs in the step 7 results report for management?
Question 22A customer complaint reveals a failure chain that was already in the PFMEA, rated O 2 and D 2. What should the team do in the FMEA?
Question 23The automatic leak tester relied on in the PFMEA breaks down and is replaced for two days by a manual bubble test. What is expected?
Question 24Which ratings does an FMEA-MSR use?