BOWTIE

Final check — Bow-Tie Risk Analysis: Threats, Barriers and Consequences

Answer the 26 questions. You need 80% or more to pass. You can retry as many times as you like.

Study the course →

Question 1What does the knot in the middle of a bow-tie diagram represent?
Question 2A plant manager wants to rank 120 workplace risks quickly to decide where to spend next year's budget. Which tool fits this first step best?
Question 3Which international standard describes bow-tie analysis among risk assessment techniques?
Question 4A team wants one diagram covering every hazard in its refinery unit: fire, toxic gas, falls, electrical work and lifting. What is the best advice?
Question 5Which wording is the best hazard for a bow-tie?
Question 6A logistics team builds a bow-tie for forklift trucks in the warehouse. Which top event should they choose?
Question 7In a workshop, the proposed top event is "explosion in the compressor house". The facilitator says it is placed too late. Why?
Question 8Which simple test helps check that a top event is placed correctly?
Question 9For the top event "H2S released outside the pipework", a participant proposes the threat "equipment failure". What should the facilitator ask for?
Question 10When should two threats be merged into one line of a bow-tie?
Question 11For the top event "load drops during a crane lift", which item is a correct consequence?
Question 12A petrol release could cause both a pool fire and groundwater pollution. How should they appear on the bow-tie?
Question 13According to the CCPS and Energy Institute bow-tie guide, a barrier must be:
Question 14A draft bow-tie lists "operator training" as a preventive barrier against tank overfill. How should the reviewer treat it?
Question 15A high-level alarm and the level gauge both take their signal from the same transmitter. Which barrier test does the alarm fail?
Question 16Which of these is a passive hardware barrier?
Question 17In a bow-tie, what does an escalation factor attack?
Question 18The bund around a diesel tank has a rainwater drain valve. On rounds, operators often find it left open. In bow-tie terms, what is the open valve and what is a suitable control?
Question 19Looking back at Buncefield (2005), what defeated the independent high-level switch on the tank?
Question 20Night-shift operators must close an isolation valve within five minutes of a gas alarm. During upsets, dozens of alarms sound at once. What should the team add to the bow-tie?
Question 21Who is most important to include in a bow-tie workshop for an operating unit?
Question 22Halfway through a workshop, two engineers spend 40 minutes arguing whether a valve check counts as a barrier. What should the facilitator do?
Question 23A team finishes a bow-tie worksheet. Several barriers have overdue tests, but the "gaps / actions" column is empty. What is missing?
Question 24What is the best description of a barrier owner?
Question 25The barrier report shows the foam system on a tank is "failed" after a test, and the spare part takes three weeks. Tank operations continue. What is the right response?
Question 26The CSB found that at Texas City (2005) many victims were in temporary trailers near the unit. On a bow-tie, which kind of barrier does trailer siting relate to?