Final check — CPIM — Certified in Planning & Inventory Management (Exam-Prep)

Answer the 45 questions. You need 80% or more to pass. You can retry as many times as you like.

Study the course →

Question 1What does CPIM stand for?
Question 2Which organization administers the CPIM certification?
Question 3The customer order decoupling point separates which two zones?
Question 4The bullwhip effect describes:
Question 5A supply chain primarily moves which three flows?
Question 6Exponential smoothing is an example of which forecasting type?
Question 7Which metric tracks the average size of forecast error?
Question 8S&OP planning is performed at what level of detail?
Question 9The output of the S&OP process that constrains master scheduling is the:
Question 10A level production strategy primarily absorbs demand variation by:
Question 11The master production schedule (MPS) is stated in terms of:
Question 12A demand time fence on the MPS exists mainly to:
Question 13Available-to-promise (ATP) represents:
Question 14Capable-to-promise extends ATP by also checking:
Question 15Low-level coding in a BOM ensures that a component is:
Question 16A phantom assembly in a BOM is:
Question 17MRP calculates requirements for which kind of demand?
Question 18Net requirements in MRP equal gross requirements minus:
Question 19Offsetting a planned order release by the lead time is called:
Question 20Which lot-sizing rule orders exactly the net requirement each period?
Question 21Rough-cut capacity planning (RCCP) validates the:
Question 22Capacity requirements planning (CRP) differs from RCCP because it:
Question 23Rated (available) capacity is typically computed as available time times:
Question 24Safety stock is held primarily to buffer against:
Question 25Pipeline (transit) inventory exists because of:
Question 26The EOQ formula minimizes the sum of which two costs?
Question 27If annual demand or order cost rises, the EOQ will:
Question 28The reorder point in a fixed-quantity system equals demand over lead time plus:
Question 29In ABC analysis, A-items are characterized by:
Question 30Cycle counting is used to:
Question 31Production activity control (PAC) is mainly concerned with:
Question 32A critical ratio below 1.0 means the order is:
Question 33In a pull (kanban) system, production is authorized by:
Question 34SMED (single-minute exchange of die) aims to:
Question 35In the theory of constraints, system throughput is limited by the:
Question 36The first of the five focusing steps in TOC is to:
Question 37Drum-buffer-rope schedules the entire system to the pace of the:
Question 38The PDCA cycle stands for:
Question 39A process that is in statistical control exhibits only:
Question 40Distribution requirements planning (DRP) is essentially:
Question 41Vendor-managed inventory (VMI) means that:
Question 42When selecting suppliers, CPIM emphasizes evaluating:
Question 43A blanket purchase order is used to:
Question 44The closed-loop planning hierarchy flows in which order?
Question 45The CPIM exam is delivered as: