السؤال 1A team chartered to reduce solder defects has met six times but keeps revisiting the same problem definition and cannot agree on scope. According to team-development theory, which stage is the team most likely stuck in, and what is the facilitator's best response?
السؤال 2Which statement best distinguishes Deming's view of quality from the traditional cost-based view?
السؤال 3On an X-bar and R chart, the R chart should generally be evaluated for statistical control BEFORE interpreting the X-bar chart primarily because:
السؤال 4A process is monitored with a p-chart using a constant subgroup size of 200. The average fraction nonconforming (p-bar) is 0.04. What is the upper control limit (UCL)?
السؤال 5A quality manager wants to use a control chart for the NUMBER of defects found per inspected aircraft wing, where each wing is the same size and can contain many possible defects. Which chart is most appropriate?
السؤال 6Eight consecutive points fall on one side of the center line of an X-bar chart, although none exceeds the control limits. The correct interpretation is:
السؤال 7Which of the following is the BEST description of the role of a 'champion' (sponsor) in a quality improvement project?
السؤال 8For a variables control chart with subgroup size n = 5, which factor is used together with R-bar to estimate the process standard deviation as sigma-hat = R-bar / d2?
السؤال 9A control chart shows a clear downward trend in defect counts over 20 subgroups following the introduction of a new fixture. Before claiming improvement, the engineer should FIRST:
السؤال 10In Juran's trilogy, which element is specifically concerned with operating the process to meet established goals and detecting/correcting sporadic problems?
السؤال 11Compared with a Shewhart X-bar chart, the primary advantage of a CUSUM or EWMA chart is that it:
السؤال 12An organization shifts training strategy from 'training everyone in all tools' to delivering Just-In-Time training tied to project needs. The primary expected benefit is:
السؤال 13A rational subgroup should be selected so that:
السؤال 14A process measured by individual readings (n = 1) is best monitored with which control chart pair?
السؤال 15During a kaizen event, the team proposes immediately implementing a new method across all five production lines. A quality engineer grounded in PDCA would recommend:
السؤال 16Which condition would most justify using an X-bar and s chart instead of an X-bar and R chart?
السؤال 17A p-chart is used for an online inspection where the sample size varies each hour. The most appropriate way to handle the varying n is to:
السؤال 18Tampering with a stable process by adjusting it after every point that is not exactly on target is an example of:
السؤال 19A self-directed (self-managed) work team differs from a traditional quality circle primarily in that the self-directed team:
السؤال 20After a control chart is established with trial limits, several out-of-control points are confirmed to have known assignable causes that were corrected. The proper next step in establishing the chart is to:
السؤال 21A team computes Cp = 1.50 and Cpk = 0.90 for a turned diameter. What does this combination indicate about the process?
السؤال 22During an ISO 9001 internal audit, the auditor finds operators using an uncontrolled photocopy of a work instruction that differs from the released master. This is BEST classified as a nonconformity against which requirement?
السؤال 23A 2^3 full factorial is run on a molding process. To estimate all three main effects, all two-factor interactions, and the three-factor interaction, what is the minimum number of distinct treatment combinations required (single replicate)?
السؤال 24A process is centered with a standard deviation of 0.004 and the specification is 2.000 ± 0.012. Assuming normality, what is the approximate Cpk?
السؤال 25In a designed experiment, what is the primary purpose of randomizing the run order of treatment combinations?
السؤال 26Which document, in a typical quality management system hierarchy, sits at the highest tier and states the organization's overall policy and how the QMS meets the standard?
السؤال 27A Cpk is reported as 1.33 while the corresponding Ppk for the same data set is 0.95. What is the MOST likely explanation?
السؤال 28An auditor's role during a third-party certification audit is BEST described as:
السؤال 29In a fractional factorial design, two effects are said to be 'aliased' (confounded) when:
السؤال 30A process performance index Pp is calculated for a process that has NOT been demonstrated to be in statistical control. Which statement is correct?
السؤال 31In a 2^2 factorial with factors A and B, the four corner responses are: (1)=20, a=30, b=24, ab=42. What is the main effect of factor A?
السؤال 32Which of the following is the PRIMARY distinction between a process audit and a product audit?
السؤال 33A response surface methodology (RSM) study would MOST appropriately be used when the objective is to:
السؤال 34Cpm differs from Cpk primarily because Cpm:
السؤال 35An audit nonconformity report states an objective finding. The auditee responds with a containment action and a plan to address the systemic cause. Which step demonstrates effective CORRECTIVE action rather than just correction?
السؤال 36A blocking variable is introduced in a DOE. The MAIN reason to block is to:
السؤال 37For a one-sided lower specification of 50 with process mean 56 and standard deviation 2, what is CPL (Cpk lower)?
السؤال 38During design of an experiment, replication (genuine repeats of treatment combinations) is valuable chiefly because it:
السؤال 39A standard (e.g., a national or international consensus standard) differs from a company procedure in that the standard is BEST characterized as:
السؤال 40A normal probability plot of the effects from a 2^4 unreplicated factorial is used to identify significant effects. Effects judged significant are those that:
السؤال 41A gage R&R study yields a total measurement system variation that is 28% of the tolerance (%GRR based on tolerance). According to AIAG guidelines, this measurement system should be:
السؤال 42In a measurement system analysis, the term 'bias' is best defined as:
السؤال 43Components of a Weibull distribution analysis are fit to field failure data and the shape parameter (beta) is found to be 0.7. This indicates that the product is in which phase of the bathtub curve?
السؤال 44In FMEA, the Risk Priority Number (RPN) is calculated as:
السؤال 45Three units are placed on a non-replacement life test. They fail at 200, 400, and 600 hours, and the test stops at the third failure. The total test time (unit-hours) accumulated is:
السؤال 46Two components, each with reliability 0.90, are arranged in a parallel (redundant) configuration. The system reliability is approximately:
السؤال 47A fault tree analysis (FTA) shows a top event fed by an OR gate with two basic events of probability 0.01 and 0.02 (independent, rare). The approximate probability of the top event is:
السؤال 48Which type of inspection error occurs when a conforming (good) unit is incorrectly classified as nonconforming?
السؤال 49An exponentially distributed component has a constant failure rate (lambda) of 0.0004 failures per hour. Its Mean Time Between Failures (MTBF) is:
السؤال 50The number of distinct categories (ndc) in a gage R&R study should generally be at least which value for the measurement system to adequately discriminate between parts?
السؤال 51In a gage R&R study, 'reproducibility' specifically refers to the variation due to:
السؤال 52A quality engineer wants to verify a 25.000 mm gage block calibration. The traceability chain should ultimately link the measurement back to:
السؤال 53FMECA differs from a basic FMEA primarily because it adds:
السؤال 54A 1-in-10 ratio rule of thumb states that the resolution (discrimination) of a measuring instrument should be no larger than:
السؤال 55When using an accelerated life test, the Arrhenius model is most appropriate when the dominant stress accelerating failure is:
السؤال 56A system has three independent components in series with reliabilities 0.95, 0.98, and 0.99. The system reliability is approximately:
السؤال 57An attribute gage study (attribute agreement analysis) is most appropriate when:
السؤال 58In MSA, 'linearity' refers to:
السؤال 59On a Weibull probability plot, the data points fall on a reasonably straight line and the slope estimate is beta = 3.4. This most likely indicates a failure mechanism dominated by:
السؤال 60A reliability engineer must reduce the RPN of a high-risk failure mode whose severity rating is 9 (safety-related and cannot be changed by design). The most appropriate first action is to:
السؤال 61In a Design FMEA, the Risk Priority Number (RPN) is calculated as the product of which three factors?
السؤال 62Two components with reliabilities 0.90 and 0.80 are arranged in series. What is the system reliability?
السؤال 63Two identical components each with reliability 0.90 are placed in parallel (active redundancy). What is the system reliability?
السؤال 64ANSI/ASQ Z1.4 is an acceptance sampling standard indexed primarily by which parameter?
السؤال 65In ANSI/ASQ Z1.4, which inspection level is the default ('general') used unless otherwise specified?
السؤال 66A key difference between ANSI/ASQ Z1.9 and Z1.4 is that Z1.9 is used for:
السؤال 67Under Z1.4 switching rules, when does a process switch from normal to tightened inspection?
السؤال 68On an OC curve, the producer's risk (alpha) corresponds to the probability of:
السؤال 69The consumer's risk (beta) on an OC curve is typically associated with which quality level?
السؤال 70In a single sampling plan with n=80 and acceptance number c=2, a lot is accepted if the number of defectives found is:
السؤال 71Average Outgoing Quality Limit (AOQL) represents the:
السؤال 72Design for Manufacturability (DFM) most directly aims to:
السؤال 73In a 2^3 full factorial design, how many runs are required (without replication)?
السؤال 74In DOE, a 'main effect' of a factor is best described as:
السؤال 75An interaction effect in a designed experiment occurs when:
السؤال 76A product has a constant failure rate (lambda) of 0.0005 failures per hour. Its reliability for a 1000-hour mission is approximately:
السؤال 77For an exponential life distribution, the MTBF equals:
السؤال 78A Weibull shape parameter (beta) greater than 1 indicates which region of the bathtub curve?
السؤال 79Compared to a single sampling plan, a key advantage of double sampling is that it can:
السؤال 80A Fault Tree Analysis (FTA) is best characterized as a:
السؤال 81A team is setting up an X-bar and R chart for a machined shaft diameter. Subgroups of n=5 are collected every hour. The grand average is 25.10 mm and R-bar is 0.046 mm (A2=0.577). What is the upper control limit for the X-bar chart?
السؤال 82When establishing a control plan, which characteristic should drive the choice of a variables control chart over an attributes chart whenever feasible?
السؤال 83A process generates one measurement per batch and consecutive readings are not meaningfully grouped. Which control chart pair is most appropriate?
السؤال 84Rational subgrouping for an X-bar/R chart aims primarily to:
السؤال 85An inspector records the number of nonconforming units in daily samples of varying size. Which attributes chart correctly handles the changing sample size?
السؤال 86A control chart shows 8 consecutive points all above the centerline, even though no single point exceeds the control limits. According to Western Electric run rules, this indicates:
السؤال 87A defects-per-unit count is plotted for inspection units of constant area (e.g., paint defects per panel). The correct chart and its control limit basis are:
السؤال 88Before computing process capability indices from SPC data, the most important prerequisite is that the process must be:
السؤال 89In a control plan, the 'reaction plan' column specifies:
السؤال 90A process is monitored with an X-bar/R chart. The R chart shows an out-of-control point while the X-bar chart appears stable. The correct sequence of action is to:
السؤال 91A team chooses subgroup size n=4 and sampling frequency every 30 minutes for a high-volume stamping press. The primary trade-off they are managing is between:
السؤال 92For an X-bar/S chart with subgroup size n=10, why is the S chart generally preferred over the R chart?
السؤال 93A control chart's limits were computed from a 25-subgroup study during a period later found to contain an assignable cause. The appropriate action before using the limits for ongoing control is to:
السؤال 94On a stable control chart, a point falling exactly on the centerline most likely represents:
السؤال 95A characteristic on a control plan is designated as a 'special characteristic' (safety/regulatory). This designation most directly affects:
السؤال 96An operator sees a single point beyond the 3-sigma upper control limit. The MOST appropriate immediate response per the control plan reaction logic is to:
السؤال 97Tampering (over-adjusting a process that is actually in statistical control) typically results in:
السؤال 98A c chart has a centerline c-bar = 4 defects per unit. What is the lower control limit (3-sigma)?
السؤال 99When designing the SPC sampling scheme for a control plan, selecting consecutive parts for each subgroup (rather than parts spread across the interval) is intended to:
السؤال 100A u chart is selected instead of a c chart when:
السؤال 101A Six Sigma project team has completed the Measure phase of DMAIC and verified the measurement system. Which activity logically belongs to the NEXT phase, Analyze?
السؤال 102A process operating at 3 sigma (short-term) with the conventional 1.5 sigma shift assumption corresponds to approximately what long-term defect rate?
السؤال 103During a kaizen event, a team finds that an operator walks 12 meters to retrieve fasteners for each assembly cycle. In Lean terms, this travel is primarily an example of which of the eight wastes?
السؤال 104A team uses the 5 Whys to investigate why a machine seized. They conclude the lubrication pump failed because its strainer was clogged with metal chips, and no cleaning was scheduled. Stopping the analysis at 'the pump failed' would most likely lead to which outcome?
السؤال 105In the PDCA (Plan-Do-Check-Act) cycle, a team has piloted a change on one line, measured the results, and confirmed the defect rate dropped. They now standardize the new method across all lines and update the work instructions. This corresponds to which phase?
السؤال 106A value stream map shows a total lead time of 18 days but a value-added (processing) time of only 4.5 hours. Which metric best summarizes this relationship and what does it indicate?
السؤال 107Customer demand is 480 units per day and the line operates 400 effective minutes per day. What is the takt time the process must meet?
السؤال 108A green belt wants to organize potential causes of a soldering defect into categories such as Machine, Method, Material, Measurement, Man, and Environment before collecting data. Which tool is most appropriate?
السؤال 109A Pareto analysis of warranty claims shows that 3 of 14 failure modes account for 81% of total claim cost. According to the Pareto principle, the team should:
السؤال 110Implementing a single-piece flow cell to replace a batch-and-queue layout will MOST directly reduce which form of waste?
السؤال 111A poka-yoke (mistake-proofing) device that physically prevents a connector from being inserted in the wrong orientation is best classified as which type of control?
السؤال 112A black belt runs a hypothesis test in the Analyze phase to compare the mean cycle time before and after a suspected cause is present. The result yields a p-value of 0.32 at alpha = 0.05. The correct interpretation is:
السؤال 113In the 5S methodology, after Sort (Seiri) and Set in Order (Seiton), the third S is Shine (Seiso). Beyond cleanliness, what is the PRIMARY quality purpose of the Shine step?
السؤال 114A team is selecting between several improvement ideas. They rate each idea on impact and ease of implementation and plot them on a 2x2 matrix to prioritize 'high impact, easy' actions first. This prioritization aid is best described as a:
السؤال 115A corrective action board reviews a containment action (100% sorting) that stopped defective parts from reaching the customer but did not change the process. Within the 8D problem-solving discipline, this action corresponds to which step, and what must still follow?
السؤال 116Total Productive Maintenance (TPM) reports an availability of 90%, a performance rate of 95%, and a quality rate of 98% for a critical machine. What is the Overall Equipment Effectiveness (OEE)?
السؤال 117A kaizen team implemented a fixture change that lowered the defect rate dramatically during the event. Six months later the gain has disappeared. Which Control-phase element was most likely missing or weak?
السؤال 118A team computes the rolled throughput yield (RTY) of a four-step process where each step has first-pass yields of 0.98, 0.95, 0.99, and 0.97. The RTY is closest to:
السؤال 119When defining a Six Sigma project, a Critical-to-Quality (CTQ) characteristic should ideally be derived from which source?
السؤال 120A SMED (Single-Minute Exchange of Die) initiative aims to reduce changeover time. The MOST fundamental first step in SMED is to:
السؤال 121A process produces 2% defective units. In a random sample of 50 units, what is the probability of finding exactly 2 defectives? (Use the Poisson approximation to the binomial.)
السؤال 122Which distribution is the appropriate model for the number of defects (nonconformities) found on a single unit of product, when defects occur independently at a constant average rate?
السؤال 123A lot of 20 items contains 4 defectives. If 5 items are drawn WITHOUT replacement, which distribution correctly models the number of defectives in the sample?
السؤال 124For a standard normal distribution, what proportion of the area lies between z = -1.96 and z = +1.96?
السؤال 125The time to failure of an electronic component follows an exponential distribution with mean 1000 hours. What is the probability the component survives beyond 1000 hours?
السؤال 126Two events A and B are mutually exclusive with P(A) = 0.3 and P(B) = 0.5. What is P(A or B)?
السؤال 127For a binomial distribution with n = 100 trials and p = 0.04, what is the standard deviation of the number of successes?
السؤال 128A characteristic is normally distributed with mean 50 and standard deviation 2. The specification limits are 46 and 54. Approximately what fraction of product falls within specification?
السؤال 129Which condition justifies approximating the binomial distribution with the normal distribution?
السؤال 130Events A and B are independent with P(A) = 0.6 and P(B) = 0.2. What is P(A and B)?
السؤال 131The Poisson distribution has the special property that its mean equals its:
السؤال 132As the degrees of freedom increase toward infinity, the Student's t-distribution approaches which distribution?
السؤال 133A quality engineer must compute the probability of getting at least 1 defective in a sample of 10 when the defect rate is 5%. What is the most efficient correct approach?
السؤال 134Which distribution is used to model the sampling distribution of a sample variance (times (n-1)/σ²) drawn from a normal population?
السؤال 135A random variable is uniformly distributed between 10 and 30. What is its mean?
السؤال 136According to the Central Limit Theorem, the sampling distribution of the sample mean approaches normality as sample size increases, regardless of:
السؤال 137Given P(A) = 0.4, P(B) = 0.5, and P(A and B) = 0.2, what is the conditional probability P(A | B)?
السؤال 138The standard deviation of the mean (standard error) for samples of size n from a population with standard deviation σ is:
السؤال 139A machine fills bottles; fill volume is normal with mean 500 mL and σ = 5 mL. What fill volume is exceeded by only 2.5% of bottles?
السؤال 140The Weibull distribution is widely used in reliability analysis primarily because:
السؤال 141A quality engineer tests H0: mu = 50 vs H1: mu != 50 at alpha = 0.05. The calculated p-value is 0.03. What is the correct decision?
السؤال 142A Type I error in hypothesis testing is best described as:
السؤال 143The power of a statistical test is defined as:
السؤال 144An engineer wants to compare the means of two independent samples when the population standard deviations are unknown and sample sizes are small (n < 30). Which test is most appropriate?
السؤال 145In simple linear regression, the coefficient of determination R-squared = 0.81. What does this indicate?
السؤال 146A 95% confidence interval for a process mean is calculated as (48.2, 51.8). Which statement is correct?
السؤال 147For a fixed sample size and effect size, decreasing alpha from 0.05 to 0.01 will:
السؤال 148A one-way ANOVA is used to compare the mean output of four machines. The null hypothesis is:
السؤال 149In an ANOVA, the F-statistic is calculated as the ratio of:
السؤال 150A chi-square goodness-of-fit test is most appropriate for which scenario?
السؤال 151An engineer doubles the sample size in a hypothesis test while holding everything else constant. What is the primary effect?
السؤال 152In regression analysis, a residual is defined as:
السؤال 153A correlation coefficient r = -0.92 between two variables indicates:
السؤال 154A paired t-test (rather than a two-sample t-test) should be used when:
السؤال 155When testing the equality of two population variances, which distribution is used?
السؤال 156A test concludes 'fail to reject H0' but the population mean has actually shifted. This situation represents:
السؤال 157In a multiple regression model, an unusually high variance inflation factor (VIF) for a predictor indicates:
السؤال 158An engineer wants to test whether a new process reduces the defect rate below 5%. The most appropriate alternative hypothesis is:
السؤال 159A residual plot from a linear regression shows a clear curved (U-shaped) pattern. This most likely indicates:
السؤال 160For a regression slope coefficient, the t-test of H0: beta1 = 0 yields p = 0.40. The correct interpretation is: