AMAADOR ACADEMYCertificatesVerify a certificate

ENG-ECON

Final check — Engineering Economics & Capital Asset Decisions: NPV, Payback, LCC & Repair-vs-Replace

Answer the 36 questions. You need 80% or more to pass. You can retry as many times as you like.

Study the course →

Question 1What core principle states that a sum of money today is worth more than the same sum in the future?
Question 2To convert a future cash flow into its present value, you must:
Question 3The present value factor 1/(1+i)^n decreases as:
Question 4A project costs 50,000 and returns 10,000 per year in equal cash flows. Its simple payback period is:
Question 5The biggest weakness of the simple payback method is that it:
Question 6Net Present Value (NPV) is calculated as:
Question 7According to the NPV decision rule, you should accept a project when its NPV is:
Question 8The Internal Rate of Return (IRR) of a project is the discount rate at which:
Question 9A project is generally acceptable when its IRR is:
Question 10The discount rate used to judge a project against the minimum acceptable return is often called the:
Question 11Life-Cycle Cost (LCC) or Total Cost of Ownership (TCO) includes:
Question 12In an LCC analysis, choosing the equipment with the lowest purchase price can be a mistake because:
Question 13For comparing assets with different lifespans, the most appropriate method is:
Question 14Equivalent Annual Cost (EAC) converts a project's costs into:
Question 15In a repair-versus-replace decision, you should generally replace the asset when:
Question 16A cost already incurred that cannot be recovered and should NOT affect a repair-vs-replace decision is a:
Question 17As equipment ages, its repair-vs-replace economics typically shift toward replacement because:
Question 18In a lease-versus-buy analysis, the typical financial advantage of leasing is:
Question 19To compare leasing against buying on a fair basis, you should compare the:
Question 20Depreciation is best described as:
Question 21Under the straight-line method, annual depreciation equals:
Question 22An asset costs 22,000 with a 2,000 salvage value and a 5-year life. Straight-line annual depreciation is:
Question 23Compared with straight-line, the declining-balance (accelerated) method:
Question 24The book value of an asset at any point in time equals:
Question 25Why does depreciation matter to a capital project's after-tax cash flow even though it is non-cash?
Question 26A CMMS implementation costs 40,000 and is projected to save 16,000 per year. Its simple ROI payback is:
Question 27Which is the most credible 'hard' saving to include in a CMMS ROI business case?
Question 28For an LED retrofit, the annual energy saving is calculated from:
Question 29A solar PV project has a payback of about 7 years and an asset life of 25 years. A defensible justification emphasizes:
Question 30When two mutually exclusive projects rank differently under NPV and IRR, the preferred tie-breaker is usually:
Question 31Using a discount rate that is too high in an NPV analysis will tend to:
Question 32A 'discounted payback period' improves on simple payback by:
Question 33Incremental cash flow analysis for a capital project should include:
Question 34To turn an engineering proposal into a defensible financial case, the engineer should:
Question 35Performing a sensitivity analysis on a capital decision means:
Question 36Two pumps deliver the same duty: Pump A costs 8,000 with high energy use; Pump B costs 12,000 with low energy use. The correct way to choose is to: