Final check — Lean Six Sigma — Green/Black Belt (Exam-Prep)

Answer the 164 questions. You need 80% or more to pass. You can retry as many times as you like.

Study the course →

Question 1A Black Belt is evaluating which improvement methodology to deploy. The defect rate is low but the process is plagued by long cycle times, excess work-in-process, and several non-value-added handoffs. Which approach is the BEST primary fit?
Question 2In a typical Six Sigma deployment, who is PRIMARILY responsible for removing organizational barriers, securing resources, and chartering projects for a business unit?
Question 3A company computes a long-term process yield and reports it at the 'Six Sigma' level. Accounting for the conventional 1.5-sigma shift, the long-term defect rate it should expect is approximately:
Question 4A team runs a full 2^3 factorial design with factors A, B, and C. How many distinct treatment combinations (corner runs, excluding replicates and center points) does the design contain?
Question 5During a DOE, a Black Belt deliberately runs the experiment in a randomized order rather than testing all low settings first, then all high settings. The PRIMARY reason for randomization is to:
Question 6A Resolution III fractional factorial design is used as a screening experiment. The KEY limitation a Black Belt must accept when interpreting its results is that:
Question 7In an ANOVA of a designed experiment, a factor shows a p-value of 0.002 at α = 0.05. The correct interpretation is that the factor:
Question 8A Black Belt wants to fit a second-order model to find a curved optimum near the current operating point. Which design is BEST suited to estimate quadratic (curvature) terms?
Question 9Adding center points to a two-level factorial design provides the PRIMARY benefit of:
Question 10An interaction plot from a 2-factor DOE shows two clearly non-parallel (crossing) lines. The MOST appropriate conclusion is that:
Question 11Which sequence correctly orders the experimental strategy a Black Belt typically follows when many candidate factors exist?
Question 12In a DOE, the difference between 'replication' and 'repetition' is important. Genuine replication requires that:
Question 13A deployment leader insists every Six Sigma project be tied to a hard financial benefit validated by Finance. The PRIMARY purpose of this requirement is to:
Question 14A Black Belt screens 7 factors but can only afford 8 runs. Which design type allows estimation of the 7 main effects in just 8 runs (assuming interactions are negligible)?
Question 15Lean defines several categories of waste (muda). Which of the following activities is NOT one of the classic seven wastes?
Question 16A value-stream map shows total lead time of 12 days but only 4 hours of value-added processing time. The MOST useful first improvement focus is to:
Question 17A confirmation (verification) run is performed after a DOE identifies optimal settings. Its main purpose is to:
Question 18In the model y = β0 + β1A + β2B + β12AB + ε from a factorial experiment, the term β12AB represents:
Question 19A Master Black Belt reviews a portfolio of proposed projects. One 'project' is actually a known fix with an obvious solution and no analysis required. The correct deployment decision is to:
Question 20A Black Belt blocks an experiment by running each replicate on a different production shift. The PURPOSE of blocking by shift is to:
Question 21When selecting the range (low/high settings) for a continuous factor in a screening DOE, a Black Belt should generally:
Question 22A Black Belt is drafting a project charter. The sponsor insists on including a detailed solution and a list of required software changes. What is the BEST response?
Question 23A goal statement in a charter reads: 'Improve customer satisfaction soon.' Which revision best follows SMART criteria?
Question 24During VOC collection, a team gathers raw verbatim comments such as 'I had to call three times.' What tool translates these into measurable, actionable requirements?
Question 25A SIPOC diagram is being built for an order-fulfillment process. Where should 'shipping carrier delivery confirmation received by the company' appear?
Question 26A Black Belt uses a Kano model on VOC data. A feature that customers do not mention but that causes strong delight when present is classified as which Kano category?
Question 27A team mapping the current state of a process notes that a SIPOC stays at a high level (typically 5–7 process steps). What is the main purpose of keeping it high-level in Define?
Question 28When prioritizing competing projects, a deployment champion wants a tool that weighs each candidate against criteria like strategic fit, cost and feasibility. Which is MOST appropriate?
Question 295S is being deployed on a shop floor. After 'Sort' (remove unneeded items), which step comes next in the canonical sequence?
Question 30A machine changeover currently takes 95 minutes, with much of the work done while the machine is stopped. Applying SMED, which action gives the biggest immediate reduction?
Question 31On a value-stream map, a process has a cycle time of 40 s but a takt time of 60 s. What does this indicate?
Question 32A line produces components in large batches that wait in front of the next station. A team implements a kanban system. What is its primary function?
Question 33Customer demand is 480 units per shift and the available working time is 27,000 seconds per shift. What is the takt time?
Question 34A maintenance team adopts Total Productive Maintenance (TPM) and tracks Overall Equipment Effectiveness (OEE). Which three factors are multiplied to calculate OEE?
Question 35A kaizen event is scheduled. Which statement BEST describes a properly run kaizen blitz?
Question 36While value-stream mapping, a team finds that finished goods sit in a warehouse for 14 days before shipment. In Lean terms, this is primarily which of the eight wastes?
Question 37A team computes process cycle efficiency (PCE) on a value-stream map. Value-added time is 30 minutes and total lead time is 5 hours. What is the PCE?
Question 38A cell produces in single-piece flow but the upstream supplier delivers in batches of 500. To enable pull without forcing the supplier to change, which Lean device is MOST appropriate at the interface?
Question 39After a successful kaizen event, the team is concerned the gains will erode. Within 5S and Lean, which element MOST directly guards against backsliding?
Question 40A problem statement reads: 'Defects are too high and management is unhappy.' Which is the strongest critique of this statement for a charter?
Question 41A Black Belt wants to compare the demand rate the line must meet against how fast each station actually produces, to balance the line. Which pairing of metrics is correct?
Question 42A Black Belt notices that during a control phase review, an Xbar-R chart shows the R chart in statistical control but the Xbar chart has several points beyond the control limits. What is the MOST appropriate first action?
Question 43Mistake-proofing (poka-yoke) devices are classified by their control function. A sensor that stops a machine when a part is incorrectly oriented is an example of which approach?
Question 44A team is in the storming stage of Tuckman's model. Which leadership behavior from the Black Belt is MOST effective at this stage?
Question 45On an attribute control chart monitoring the number of defects per unit when sample size varies, which chart is appropriate?
Question 46A control plan is being finalized. Which element is essential to ensure the plan sustains the improvement after the project closes?
Question 47Using the Western Electric (Nelson) rules, which pattern signals an out-of-control condition even when no single point exceeds the 3-sigma limits?
Question 48A Black Belt must select a tool to reach consensus when a team has generated 40 improvement ideas and needs to prioritize them quickly with equal member input. Which tool is BEST?
Question 49An I-MR chart is used instead of an Xbar-R chart in which situation?
Question 50A process is in statistical control but is not meeting the customer specification. What does this indicate?
Question 51During the control phase, a Black Belt wants to detect a small (about 1-sigma) sustained shift in the process mean as early as possible. Which chart is BEST suited?
Question 52A Champion's primary responsibility within a Six Sigma deployment is MOST accurately described as:
Question 53When establishing control limits on a new Xbar chart, the calculated limits are based on:
Question 54A Black Belt is leading a cross-functional team but lacks direct authority over the members, who report to other managers. Which type of authority is the Black Belt primarily relying on?
Question 55A control chart shows a run of 7 increasing points (a trend) on the Xbar chart although all points remain within the control limits. The CORRECT interpretation is:
Question 56Which of the following is the BEST example of designing a process so an error becomes physically impossible, rather than merely detectable?
Question 57A team's progress has stalled because two members consistently dominate discussions while others disengage. The MOST appropriate facilitation response is to:
Question 58On a p chart with varying subgroup sizes, the control limits will appear as:
Question 59A Black Belt is choosing the rational subgroup strategy for an Xbar-R chart. The PRIMARY goal of rational subgrouping is to:
Question 60A control plan must specify the response when a process measure goes out of specification. The document that operators follow at that moment is called the:
Question 61A team experiences a negotiation deadlock between operations and quality over an acceptance threshold. The BEST conflict-resolution mode for reaching a durable solution that satisfies both interests is:
Question 62After implementing a poka-yoke and a control chart, a Black Belt wants to verify the gains are sustained over time before formally closing the project. The BEST evidence of sustained control is:
Question 63A team builds a SIPOC and then drills into a detailed flowchart. To classify each step as value-added or non-value-added during process mapping, which test must a step pass to be considered value-added?
Question 64During an MSA, a Gage R&R study reports %R&R (as a percentage of total variation) of 28%. According to AIAG guidelines, how should this measurement system be judged?
Question 65In a Gage R&R study, the Number of Distinct Categories (ndc) is calculated as 3. What does this indicate about the measurement system's ability to discriminate parts?
Question 66A Black Belt finds that two inspectors disagree on whether borderline parts are 'pass' or 'fail.' Which MSA study is most appropriate to quantify this measurement system?
Question 67Repeated measurements of a single master part by one appraiser drift consistently lower as the day progresses, then reset each morning. This pattern most directly indicates a problem with which measurement system property?
Question 68A measurement gage reads accurately at the low end of the range but shows increasing positive bias as the measured dimension gets larger. Which property is deficient?
Question 69In a Gage R&R study, the reproducibility component is found to be much larger than the repeatability component. What is the most likely root cause?
Question 70A team is designing a data-collection plan for a service process. They want to capture the time of day, the agent, and the call type alongside handling time. Which data-collection principle does adding these stratification factors support?
Question 71Two data collectors record 'defective' units differently because one counts cosmetic scratches and the other does not. What is the primary tool needed to fix this before collecting data?
Question 72A characteristic is measured to the nearest 1 mm, but the process tolerance is ±2 mm. According to the '10-bucket' (10% of tolerance) rule of thumb, what is the concern with this gage?
Question 73When selecting parts for a Gage R&R study, why is it important to choose parts that span the full range of process variation rather than parts that are all near nominal?
Question 74A spaghetti diagram of an office process reveals operators walking long, crossing paths repeatedly. In a Measure-phase process study, this tool is primarily used to expose which type of waste?
Question 75In a high-RPM FMEA, a failure mode has Severity = 9, Occurrence = 2, Detection = 3. A second failure mode has Severity = 4, Occurrence = 7, Detection = 7. Which should generally be prioritized first, and why?
Question 76After implementing improvements, a team re-scores an FMEA. They added an automated error-proofing sensor that catches the failure before it escapes. Which FMEA rating should most directly decrease?
Question 77A poka-yoke that physically prevents a connector from being inserted backward is added to a process. From an FMEA standpoint, this control most directly reduces which rating?
Question 78To sustain gains after a project closes, a Black Belt builds a control plan. Which combination of elements best ensures the improvement holds over time?
Question 79A control plan specifies a reaction plan for an out-of-control SPC signal. What is the primary purpose of including the reaction plan in the control plan?
Question 80A risk-management team distinguishes between an FMEA and a fault tree analysis (FTA). Which statement best captures the difference in reasoning direction?
Question 81During the Measure phase, a Black Belt must decide between systematic sampling and simple random sampling for a continuously running line. Which risk is specifically associated with systematic (every nth unit) sampling?
Question 82An FMEA team notes that two failure modes both have RPN = 120, but one has Severity = 10 and the other Severity = 3. Best practice for prioritization recommends what?
Question 83A value-stream map shows total lead time of 12 days but value-added processing time of only 4 hours. This contrast most directly quantifies which metric used to target improvement?
Question 84A stable process has a mean of 50.0, a standard deviation of 2.0, and specification limits of 44.0 and 56.0. What is the process capability index Cp?
Question 85For the same process (mean 50.0, sigma 2.0, USL 56.0, LSL 44.0), what is Cpk?
Question 86A process is centered exactly at its target. Which relationship between Cp and Cpk is necessarily true?
Question 87A Black Belt finds Cp = 1.80 but Cpk = 0.90 for a key dimension. What is the most appropriate corrective action?
Question 88What fundamentally distinguishes process performance indices Pp/Ppk from process capability indices Cp/Cpk?
Question 89A process produces 8 defects across 200 units, where each unit has 5 opportunities for a defect. What is the DPMO?
Question 90A long-term process operates at 3.4 DPMO. Using the conventional 1.5 sigma shift, what is its long-term sigma level?
Question 91A unit must pass 4 independent process steps, each with a first-pass yield of 0.95. What is the rolled throughput yield (RTY)?
Question 92For a one-sided specification with only an upper limit (USL), which index is the correct measure of capability?
Question 93The Taguchi capability index Cpm differs from Cpk primarily because Cpm penalizes which condition?
Question 94Before computing Cpk from an Xbar-R study, which assumption MUST be verified for the index to be valid?
Question 95A capability study yields Cpk = 1.33. Approximately what short-term sigma level does this correspond to?
Question 96Histogram analysis shows the characteristic is strongly right-skewed (non-normal). What is the BEST approach before reporting Cpk?
Question 97A process has 250 defects observed on 50 units. What is the DPU (defects per unit)?
Question 98For a process with DPU = 0.10, the Poisson-based throughput yield (probability of zero defects) for a single unit is approximately:
Question 99Why does the Six Sigma convention add a 1.5 sigma shift when converting between short-term and long-term capability?
Question 100A team reports Cpk = 2.0 for a centered process. Roughly what defect rate (per million) does the short-term distribution predict?
Question 101A short-term capability study (within-subgroup sigma) gives Cpk = 1.50, but the long-term Ppk over months is only 0.90. This gap most strongly indicates:
Question 102A characteristic has USL = 10.0, LSL = 4.0, process mean = 9.0, sigma = 1.0. What is Cpk?
Question 103In a capability analysis, the gauge R&R study shows measurement variation consumes 35% of total variation. What is the correct impact on the reported Cpk?
Question 104Which statement BEST describes the difference between a 'defect' and a 'defective' unit in Six Sigma metrics?
Question 105A Black Belt runs a multi-vari study on shaft diameter and finds the largest variation occurs between consecutive parts produced moments apart, while part-to-part spread within a batch and shift-to-shift means are small. Which family of variation is dominant?
Question 106In a multi-vari study, three sources of variation are conventionally captured. Which set correctly names them?
Question 107A team measures wall thickness at four locations (top, bottom, left, right) on each molded part. Large differences among the four locations on a single part indicate which type of variation in a multi-vari framework?
Question 108What is the PRIMARY purpose of conducting a multi-vari study early in the Analyze phase?
Question 109A multi-vari chart shows that successive sampled parts swing high then low in a repeating pattern roughly every 8 parts, matching the number of cavities in the mold. What is the most likely interpretation?
Question 110When sampling for a multi-vari study, why is it important NOT to deliberately change or adjust the process during data collection?
Question 111A Black Belt builds a box plot of fill volume for five filling heads. Head 3's box sits noticeably higher than the others with no overlap of interquartile ranges. What does this MOST directly suggest?
Question 112On a box plot, an observation is plotted as an individual point beyond the upper whisker. Using the common 1.5 IQR rule, this point lies more than 1.5 times the interquartile range above which value?
Question 113A Black Belt wants to compare the distribution shape, center, and spread of cycle times across four production lines in a single graphic. Which exploratory tool is BEST suited?
Question 114A scatter plot of oven temperature versus tensile strength shows points fanning out into a wider band as temperature increases. Beyond any linear trend, what does this widening pattern primarily indicate?
Question 115While exploring data, a Black Belt builds a histogram of bore diameters and observes two distinct peaks (bimodality). What is the most appropriate next exploratory step?
Question 116A run chart of daily yield shows a single point that is dramatically lower than all others, with no shift, trend, or cycle elsewhere. In EDA terms, this point is best described as a(n):
Question 117Which statement BEST distinguishes a multi-vari study from a designed experiment (DOE)?
Question 118A Black Belt wants to expose how a continuous output (surface finish) differs across the levels of a categorical input (three coolant types) and detect any unusual spread. Which plot gives the richest exploratory view?
Question 119In a multi-vari plot, the vertical spread of points within each sampling time period is small, but the average of each time period drifts steadily upward across the day. Which variation source should the team investigate first?
Question 120Which of the following is a correct guideline for planning the SAMPLING of a multi-vari study?
Question 121A Black Belt notices that a histogram is strongly right-skewed with a long upper tail. Which EDA action is MOST appropriate before applying tools that assume normality?
Question 122A scatter plot matrix (pairwise plots) of several process inputs against the output is built during EDA. Its main exploratory value is to:
Question 123A run chart shows eight consecutive points all above the median line. In exploratory analysis of process data over time, this nonrandom pattern is most consistent with:
Question 124After a multi-vari study isolates within-piece (positional) variation as dominant for a turned shaft's diameter, what is the LOGICAL next investigative focus?
Question 125A Black Belt runs a two-sample t-test comparing cycle times of two suppliers and obtains a p-value of 0.032. Using alpha = 0.05, what is the correct conclusion?
Question 126In hypothesis testing, a Type II error occurs when a practitioner:
Question 127A 95% confidence interval for a process mean is computed as (12.4, 15.6). Which interpretation is correct?
Question 128An engineer wants to compare the variances of two machines' output to check for equal spread before running a t-test. Which test is most appropriate?
Question 129Holding everything else constant, increasing the sample size in a hypothesis test will:
Question 130A team measures the same 30 parts before and after a process change to compare means. Which test correctly accounts for the dependency between the two measurements?
Question 131To compare the mean output of four different production lines simultaneously, the most appropriate parametric test is:
Question 132Why is running many separate pairwise t-tests instead of ANOVA to compare several group means problematic?
Question 133A quality analyst wants to test whether the proportion of defective units differs between two shifts. Which test is most appropriate?
Question 134The power of a hypothesis test is best defined as:
Question 135A Black Belt expects an improvement to RAISE the mean strength of a weld. To maximize sensitivity to that direction, the hypotheses should be set up as:
Question 136A one-sample t-test produces a p-value of 0.18 at alpha = 0.05. Which statement is most accurate?
Question 137The t-distribution is used instead of the standard normal (Z) distribution for inference about a mean primarily when:
Question 138An ANOVA returns a p-value of 0.001, indicating at least one group mean differs. What is the appropriate next step to identify WHICH means differ?
Question 139The distribution of process data is heavily skewed and ordinal, and the team wants to compare the medians of two independent groups. The best choice is:
Question 140If a 95% confidence interval for the difference of two means (mu1 - mu2) is (-0.8, 2.4), what can be concluded at alpha = 0.05?
Question 141A team needs to test whether observed defect categories (scratch, dent, crack) are independent of three molding machines. Which test applies?
Question 142A result is statistically significant (p = 0.001) but the estimated mean shift is only 0.02 mm, far below what customers can detect or care about. The Black Belt should recognize that:
Question 143All else equal, how does a 99% confidence interval compare to a 95% confidence interval for the same data?
Question 144Before applying a two-sample t-test, a Black Belt should check which of the following key assumptions?
Question 145A Black Belt computes a Pearson correlation coefficient of r = 0.85 between two process variables. What does this value primarily indicate?
Question 146In a simple linear regression, the coefficient of determination R² = 0.64. How should this be interpreted?
Question 147A scatter plot shows a clear U-shaped (parabolic) pattern between X and Y. A Black Belt calculates Pearson's r and gets approximately 0. What is the BEST conclusion?
Question 148A regression model gives the equation Ŷ = 12.4 + 3.7X. If X represents oven temperature (°C) and Y represents yield (%), what does the slope 3.7 represent?
Question 149When testing the significance of a regression coefficient, the p-value for the slope is 0.002 (α = 0.05). What is the correct conclusion?
Question 150A Black Belt observes a strong correlation (r = 0.9) between ice cream sales and drowning incidents in a city. What is the most likely explanation?
Question 151In residual analysis after fitting a linear regression, the residuals show a clear funnel shape (spreading out as fitted values increase). What does this indicate?
Question 152A Black Belt wants to assess the linear association between two ordinal (ranked) variables that are not normally distributed. Which coefficient is most appropriate?
Question 153In a multiple regression model with three predictors, a Black Belt finds that two predictors are highly correlated with each other (VIF > 10). What is this condition called?
Question 154A regression model based on data with X ranging from 10 to 50 is used to predict Y at X = 95. What is the primary concern?
Question 155A Black Belt fits a regression and the ANOVA table shows a significant 'lack-of-fit' test. What does this most strongly suggest?
Question 156The Pearson correlation between two variables is r = -0.72. Which statement is correct?
Question 157A Black Belt is comparing two regression models for the same dataset. Model A has more predictors and a higher R² than Model B. Which metric better guides model selection by penalizing unnecessary predictors?
Question 158In a normal probability plot of regression residuals, the points fall approximately along a straight line. What does this confirm?
Question 159A Black Belt computes a confidence interval for a regression slope as (0.8, 2.3). At the same α, what can be concluded about the slope's significance?
Question 160A Black Belt wants to distinguish between a confidence interval and a prediction interval in regression. Which statement is TRUE?
Question 161During analysis, a single data point has a very large residual and high leverage, dramatically changing the slope when removed. What is this point called?
Question 162A Black Belt suspects the relationship between cycle time and batch size curves upward at high values. Which approach best captures this?
Question 163Two variables have a Pearson correlation of r = 0.30 with a sample size of n = 8, and the p-value is 0.47. What is the most appropriate interpretation?
Question 164A Black Belt performs a hypothesis test on the population correlation coefficient ρ. Which set of hypotheses correctly tests for a linear relationship?