PTW

Final check — Permit to Work

Answer the 23 questions. You need 80% or more to pass. You can retry as many times as you like.

Study the course →

Question 1What is the main purpose of a Permit to Work (PTW) system?
Question 2Which of these activities would typically require a permit to work?
Question 3Who reviews the precautions and signs to authorise the work?
Question 4Why must the same person never both authorise and accept their own high-risk permit?
Question 5In lock-out/tag-out (LOTO), what must be done after isolating energy sources and before starting work?
Question 6In the permit lifecycle, what comes immediately before authorisation?
Question 7A permit reaches the end of its validity time but the work is not finished. What should happen?
Question 8Why do some jobs need cross-referenced permits?
Question 9Which is identified as the most dangerous moment in the permit lifecycle?
Question 10What is the golden rule once a permit is issued?
Question 11According to HSE guidance, a permit-to-work is best described as…
Question 12A job will break containment on a solvent line and use a grinder. Which permits are needed?
Question 13Why should the issuer and the performing authority be different people?
Question 14Which is the last step before work starts under a lock-out?
Question 15Which isolation gives the highest assurance on a process line?
Question 16Stored energy that must be released or restrained includes…
Question 17At a shift change during a lock-out, the safe practice is…
Question 18After a lunch break on a hot-work job, what should the permit require?
Question 19Who confirms the area is safe before isolations are removed at hand-back?
Question 20A welder is asked to work three metres outside the tested area. What applies?
Question 21Why must permits in the same area be cross-referenced?
Question 22Which is a useful lead indicator for a permit system?
Question 23“As before” written in the hazard section of a permit is…