Final check — TPM and OEE: Total Productive Maintenance with OEE Calculation

Answer the 24 questions. You need 80% or more to pass. You can retry as many times as you like.

Study the course →

Question 1What is the core idea of TPM compared with traditional maintenance?
Question 2A plant wants new filling machines to be easier to clean and maintain, using problems seen on the old ones. Which TPM pillar covers this?
Question 3Which organisation is most closely associated with developing and promoting TPM?
Question 4A spare-parts order for a critical pump takes three weeks because of approval loops and wrong part numbers. Which TPM pillar would tackle this loss?
Question 5A line stops for 40 minutes to change from 500 ml to 1 litre bottles, including adjustments until the first good bottle. Which big loss is this?
Question 6After each restart in the morning, the first 60 trays are scrapped until the oven reaches a stable temperature. Where does this loss belong?
Question 7Which pair of big losses reduces the performance factor of OEE?
Question 8To make OEE look better, a supervisor wants to record a three-hour breakdown as 'planned maintenance'. What is the effect?
Question 9Planned production time is 400 min. The machine ran 340 min. Ideal cycle time is 1 min and it made 306 parts, of which 300 were good. What is availability?
Question 10Same data: planned 400 min, run 340 min, ideal cycle 1 min, 306 parts made, 300 good. What is the OEE?
Question 11Which cycle time should be used to calculate the performance factor?
Question 12A line made 1,000 parts. 40 were scrapped and 60 were reworked and then shipped. What is the quality factor?
Question 13What is the first step of autonomous maintenance in the classic seven-step sequence?
Question 14During cleaning, an operator finds oil dripping from a gearbox seal. He cannot repair it himself. What should he do?
Question 15A team plans to clear sugar dust from the top of a packing machine with compressed air before an audit. What is the main problem?
Question 16What does step 2 of autonomous maintenance aim to do?
Question 17A pump bearing gives rising vibration weeks before it fails. Which maintenance strategy fits best?
Question 18If planned maintenance is working, how should MTBF and MTTR move?
Question 19A focused improvement team is set up to cut jams on a labeller. What should it do before searching for a root cause?
Question 20A technician removes a relief valve for repair at the end of his shift. The repair is not finished. What does the Piper Alpha disaster teach about this moment?
Question 21In the daily review, a team leader says 'OEE was 68% yesterday'. What would make the review more useful?
Question 22A plant has five machines in a line. The filler is the bottleneck. Where should OEE tracking and TPM start?
Question 23What is the main risk of using OEE to rank and blame teams?
Question 24Two months after a TPM launch on twenty machines, 300 red tags are open and operators have stopped tagging. What is the best corrective step?