Question 1In a typical oil and gas permit-to-work system, who owns the plant area and decides which precautions go on the permit?
Question 2An issuer who is also authorised as a receiver offers to sign as both issuer and receiver on a small job to save time. What is correct?
Question 3You are the receiver. A process valve next to your worksite is dripping and your foreman asks you to close it. You are not an operator or isolating authority. What should you do?
Question 4What is the main duty of the standby man (hole watch) during a confined space entry?
Question 5A worker in your crew notices a strong gas smell and says the job looks unsafe. The issuer is at the other end of the plant. Who may stop the work?
Question 6When the receiver signs to accept a permit, what is he stating?
Question 7You are called to a two-hour meeting while your crew is working under your permit. What should you do?
Question 8Your crew needs to run a portable diesel generator inside a classified hazardous area of a gas plant. Which permit type would most sites require?
Question 9What does cross-referencing mean in a permit-to-work system?
Question 10Your permit and another crew's permit share the same isolation certificate. Your job finishes first. May the isolations now be removed?
Question 11Which precautions are typical of a radiography permit or certificate?
Question 12Your crew has a cold work permit to install a sign post. On site you find the hole must be dug 1.2 m deep in a pipeline corridor. What should you do?
Question 13Your permit is for pump P-201A. The attached isolation certificate lists P-201B. The pumps stand side by side. What do you do?
Question 14According to HSG250, why must the permit be backed by a job-specific risk assessment (JSA)?
Question 15The issuer is busy and tells you: "Sign it here in the control room, the isolations are all done." What should you do?
Question 16Which isolation method is generally considered the most secure for vessel entry?
Question 17During the site visit for welding on a pipe support, you see an uncovered oily-water drain two metres from the weld point. What should you do?
Question 18A permit request you are about to submit says only "Repair line". What is the right action?
Question 19What does OSHA 29 CFR 1910.147 require before servicing equipment?
Question 20Which oxygen range is commonly accepted for entry, based on the OSHA confined space definitions?
Question 21Pre-entry gas test of a vessel: O2 20.8%, flammable 12% LEL, H2S 0 ppm, CO 0 ppm. The site limit for entry is below 10% LEL. What is the decision?
Question 22Before welding, the gas test at the work point shows 3% LEL. Your site requires 0% LEL for hot work. What do you do?
Question 23Why is a vessel tested at the top, middle and bottom before entry?
Question 24Your crew has been welding on a pipe support since 07:00 after a clear gas test. They stop for a one-hour lunch break. The permit says re-test after any break. What must happen before welding restarts?
Question 25Why is an oxygen-enriched atmosphere (above about 23.5%) treated as dangerous?
Question 26Two entrants are inside a column. The standby's continuous monitor shows oxygen falling from 20.9% to 19.8% over the last hour. It is still above the 19.5% limit. What should you do?
Question 27You are preparing a permit to change a valve. The planner gives you the JSA used for the same job last year on another unit. Today a crane will be lifting nearby and the crew includes two new workers. What should you do?
Question 28During the joint site visit, the isolation certificate shows double block and bleed on the hydrocarbon line. You find both block valves locked closed, but the bleed valve between them is closed and has no lock or tag. What do you do?
Question 29Your crew holds a cold work permit to unbolt a flange. Two bolts are seized and the fitter wants to cut them off with a disc grinder. What is the correct action?
Question 30You are on the site register as a receiver for the utilities area only. An issuer in the gas compression area asks you to receive a permit there today: “You've done this for years.” What should you do?
Question 31At 10:00 a scaffolder from another team is sent to join your crew. The toolbox talk was held at 07:00. He says he knows the job and can start straight away. What do you do?
Question 32Why is the permit, or its worksite copy, displayed at the job?
Question 33Your crew is grinding on the pipe rack under a hot work permit. An operator arrives and starts draining a vessel 15 m away into an open drain. What should you do?
Question 34The general alarm sounds and your crew goes to the muster point. Twenty minutes later the all-clear is given. The crew wants to go straight back and finish. What is correct?
Question 35Your permit is to replace a gasket on a flange. When it is opened, the crew finds a badly corroded pipe section. The foreman says: “We have the tools here, let's replace the spool now.” What do you do?
Question 36Your crew is working in an excavation protected by edge barriers. Another team removes a section of the barrier to bring a pump through and leaves it open. What should you do?
Question 37What is the usual difference between a suspended permit and a cancelled permit?
Question 38The job will continue on night shift. The incoming receiver is 40 minutes late. The outgoing receiver wants to leave the permit in the permit box with a note and go home. What is correct?
Question 39Your permit expires at 18:00. At 17:50 the fitter says he needs another 30 minutes to finish bolting up. What should you do?
Question 40At the end of the job a spade is still fitted and one flange is open because a replacement gasket did not arrive. How do you sign back the permit?
Question 41At hand-back, who removes the receiver's personal lock from the group lock box?
Question 42Hot work ends at 15:00. The crew packs up and the fire watch wants to leave with them. Your site requires the fire watch to stay for a set time after hot work. What do you do?
Question 43After the receiver signs back a completed job, when can the isolations be removed?
Question 44According to the Cullen inquiry, why did the Piper Alpha night shift start condensate pump A?
Question 45Which major change in UK offshore regulation followed the Cullen report on Piper Alpha?
Question 46Practice question: “During hot work, the continuous gas monitor alarms. Ten seconds later the reading drops back to 0% LEL. What do you do?”
Question 47Practice question: “Your crew has just signed on after the toolbox talk. The issuer radios that the next unit is starting up and may flare. What do you do?”