Customize this training

Get a certificate — $15$5

ASQ CSQP Exam Prep: Certified Supplier Quality Professional

ASQ CSQP Exam Prep: Certified Supplier Quality Professional

Revise supplier strategy, risk, selection, PPAP and capability, scorecards, SCAR and relationship management, then practise CSQP-style scenarios to prepare for the ASQ exam.

What you will learn

  • Describe the CSQP exam and build a supplier strategy: segmentation, make-or-buy, total cost of ownership and sourcing models.
  • Identify, assess and mitigate supplier and supply chain risks, including continuity, counterfeit and fraud risks.
  • Select, qualify and onboard suppliers using criteria, assessments, audits and quality agreements.
  • Approve supplier products and processes with APQP, PPAP, first article inspection, control plans, MSA and capability studies.
  • Monitor and improve supplier performance with scorecards, receiving inspection, SCAR, 8D and supplier development.
  • Manage supplier relationships, communication, change control, disengagement and ethics, and apply a sound exam strategy.

Modules

  1. The CSQP exam and supplier strategy
  2. Supplier risk management
  3. Supplier selection, qualification and onboarding
  4. Product and process approval: APQP, PPAP and FAI
  5. Supplier performance monitoring and improvement
  6. Relationship management, change control, ethics and exam strategy

Course facts

Level
Exam preparation
Estimated study time
about 2 hours
Final assessment
42 questions · Pass mark 70%
Available in
English
Price
Free. Optional verifiable certificate: $5
Last updated
Published by
AMAADOR ACADEMY

Who this course is for

Supplier quality engineers, supplier development engineers, purchasing and sourcing staff, quality managers and auditors in manufacturing, automotive, aerospace, medical devices, food and services, in Morocco, France, the GCC and worldwide, who are preparing the ASQ CSQP exam.

Prerequisites

Working knowledge of quality basics (ISO 9001, basic statistics, root cause analysis) and some hands-on experience with suppliers. Keep ASQ's current CSQP Body of Knowledge open while you revise.

Course content

1. The CSQP exam and supplier strategy

The Certified Supplier Quality Professional (CSQP) is a certification run by ASQ (American Society for Quality). It is aimed at people who manage the quality of what an organisation buys: supplier quality engineers, supplier development engineers, buyers with quality duties and quality managers who own the supply base.

ASQ publishes a Body of Knowledge (BoK) for the CSQP on its certification page. The BoK lists the topics that can be examined and the depth (cognitive level) expected for each one. This course follows the main supplier quality themes that the BoK is built around: strategy, risk, selection and onboarding, product and process approval, performance monitoring and improvement, and relationship management.

Remember: this course could not confirm the current exam details from ASQ's site at the time of writing. Before you book, check on asq.org the number of questions, the time allowed, the open-book rules, how the pass score is reported, the BoK edition in force and the work experience you must show. Study from the BoK edition that applies on your exam date.

2. Supplier risk management

Supplier risk is any event at or around a supplier that could stop supply, deliver nonconforming product or harm your customers, finances or reputation. ISO 31000 gives the general process: establish the context, identify risks, analyse them, evaluate them, treat them, then monitor, review and communicate.

Where supplier risk comes from

Risk categories to screen for every critical supplier.

Look beyond the tier 1 supplier. Many disruptions start at tier 2 or tier 3: a raw material, a coating subcontractor, a single resin plant. Mapping the sub-tier chain for critical items is a core supplier quality task.

Analysing risk

  • Risk matrix — likelihood times impact, scored on a simple scale (for example 1-5) to rank suppliers.
  • FMEA — for a supplier process or part: severity, occurrence and detection. The AIAG and VDA FMEA Handbook (2019) replaced the old RPN ranking with Action Priority (AP) high, medium or low.
  • Supplier financial screening — late payments, falling credit ratings, key customer losses, sudden staff turnover.
  • Single point of failure review — one site, one machine, one key person, one sub-supplier.

3. Supplier selection, qualification and onboarding

ISO 9001 clause 8.4.1 requires the organisation to determine and apply criteria for the evaluation, selection, monitoring of performance and re-evaluation of external providers, based on their ability to provide conforming product, and to keep documented information of these activities.

Typical selection criteria

AreaWhat to look for
Quality systemCertification (ISO 9001, IATF 16949, AS9100, ISO 13485), audit results, nonconformity history
Technical capabilityEquipment, process capability data, engineering support, test labs
Capacity and deliverySpare capacity, lead time, planning system, logistics
Financial stabilityAccounts, credit rating, customer concentration
CostPrice and TCO, willingness to improve cost
Compliance and ESGRegulatory status, REACH and RoHS, labour and environmental practices

A weighted scoring matrix makes the choice transparent: give each criterion a weight, score each candidate, multiply and add. Agree the weights with purchasing, engineering and quality before the bids arrive, so the matrix is not tuned to a favourite.

Ways to assess a candidate

  • Self-assessment questionnaire — cheap first screen; claims must be verified.
  • Certificate check — confirm scope, site and validity with the certification body's register.
  • On-site audit — system audit (does the QMS exist and work?), process audit (is this process capable and controlled?) or product audit (does the product meet requirements?).
  • Samples and trial lots — tested against the full specification.

4. Product and process approval: APQP, PPAP and FAI

APQP (Advanced Product Quality Planning), published by AIAG, is a structured way to plan a new product and its process so it meets requirements at launch. The APQP 2nd edition manual describes five phases: plan and define the programme; product design and development; process design and development; product and process validation; and feedback, assessment and corrective action. AIAG published an APQP 3rd edition in March 2024, so check its wording if your BoK cites it.

PPAP (Production Part Approval Process) is the output of the validation phase. It shows that the supplier understands all requirements and that its process can consistently make conforming parts at the quoted production rate, using production tooling, materials, people and sites.

PPAP essentials (AIAG PPAP, 4th edition)

  • The manual lists 18 elements, including design records, engineering change documents, customer engineering approval, DFMEA, process flow diagram, PFMEA, control plan, MSA studies, dimensional results, material and performance test results, initial process studies, qualified laboratory documentation, appearance approval report, sample parts, master sample, checking aids, customer-specific requirements and the Part Submission Warrant (PSW).
  • There are five submission levels. Level 1 is the warrant only; level 3 (warrant, samples and complete supporting data) is the default unless the customer specifies otherwise; level 5 means everything is reviewed at the supplier's site.
  • Initial process studies on special characteristics usually target Ppk above 1.67 under the manual's acceptance criteria; values from 1.33 to 1.67 may be accepted with customer agreement.

5. Supplier performance monitoring and improvement

ISO 9001 clause 8.4.1 requires the organisation to monitor supplier performance and re-evaluate suppliers. A supplier scorecard turns that requirement into a regular, fact-based conversation.

Common supplier metrics

MetricHow it is calculated
Defective parts per million (PPM)Rejected parts / parts received x 1,000,000
Lot acceptance rateLots accepted / lots received x 100
On-time delivery (OTD)Deliveries inside the agreed window / total deliveries x 100
SCAR responsivenessContainment and 8D steps closed on time
Cost of poor supplier qualitySorting, scrap, line stops, warranty charged to the supplier's parts

Worked example: 450 rejected parts out of 300,000 received gives 450 / 300,000 x 1,000,000 = 1,500 PPM.

Good scorecards are weighted (quality often weighs most), defined in advance, shared with the supplier, trended over time and linked to consequences: preferred status, new business, development or probation.

Receiving inspection and sampling

Incoming inspection is an appraisal cost; it detects but does not prevent. Use it in proportion to risk and history. Sampling standards such as ANSI/ASQ Z1.4 and ISO 2859-1 give attribute sampling plans indexed by lot size, inspection level and AQL (acceptance quality limit), with switching rules between normal, tightened and reduced inspection.

6. Relationship management, change control, ethics and exam strategy

Supplier relationships range from transactional (arm's length, price-driven, for non-critical items) to collaborative or strategic partnership (shared goals, open data, joint development). The right type follows the segmentation from module 1.

Making the relationship work

  • Single points of contact on both sides, plus a known escalation path
  • Regular reviews — monthly operational meetings, quarterly or annual business reviews with scorecard trends
  • Early supplier involvement — invite key suppliers into design so tolerances and materials suit their process
  • Two-way feedback — ask suppliers how your forecasts, drawings and payment practices affect them
  • Recognition — supplier awards and preferred status reward good performance

Change control

Unapproved supplier changes are a leading source of escapes. ISO 9001 clause 8.5.6 requires the control of changes for production, and the quality agreement should make the rule explicit: no change without prior written approval.

Change typeExamplesUsual requirement
DesignDrawing revision, new material gradeCustomer engineering approval, new PPAP or FAI
ProcessNew machine, new method, new sequenceNotification, risk review, often PPAP
LocationNew site, line transferApproval before move, run-at-rate, PPAP
Sub-supplierNew raw material source or subcontractorNotification and approval, test evidence

The full lesson continues in the interactive course on this page.

Sources and references

Unofficial practice course. Not affiliated with, endorsed by or sponsored by ASQ (American Society for Quality). CSQP and Certified Supplier Quality Professional are trademarks of their owner. Check the current exam outline on ASQ's website before you book. The practice questions are original and are not taken from any ASQ exam.

All courses · Quality and Operational Excellence — Free courses, certificate $5 | AMAADOR ACADEMY