New technology
Lithium-ion batteries and energy storage: what Great Britain’s rules already require
HSE’s guidance for grid-scale battery energy storage systems sets out the health and safety law that already applies to designers, installers and operators — including DSEAR, the Electricity at Work Regulations, and notification of the fire and rescue service at 25 tonnes.

Lithium-ion batteries now appear in tools, vehicles and, at a very different scale, in grid-connected energy storage compounds. The hazards are not identical in every setting, and it is important not to stretch one regulator page over every use. This article focuses on what the Health and Safety Executive (HSE) has published for grid-scale battery energy storage systems (BESS) in Great Britain, because that is where HSE has set out, in one place, which health and safety law already applies to designers, installers and operators.1
HSE’s starting point is not a new “battery law”. If you design, install or operate BESS, you already have a legal responsibility to comply with existing health and safety legislation. HSE lists the Health and Safety at Work Act, which places duties on employers to manage risks to employees, other workers and the public; the Dangerous Substances and Explosive Atmospheres Regulations (DSEAR), which set minimum requirements for protecting workers and others from fire and explosion risks; the Electricity at Work Regulations, which require precautions against death or personal injury from electricity in work activities; the Management of Health and Safety at Work Regulations, which require risks to be assessed and appropriately managed; the Construction (Design and Management) Regulations, which set requirements so that the whole construction project is carried out in a way that secures health and safety; and the Dangerous Substances (Notification and Marking of Sites) Regulations, which require operators of sites holding 25 tonnes or more of a dangerous substance to notify their local fire and rescue service in writing and to display signs.1
HSE’s conclusion on that list is explicit: if you comply with these regulations, you will manage the health and safety risks of BESS.1
Fire, explosion and the 25-tonne notification
DSEAR is the primary legislation in Great Britain for controlling substances that can cause fires and explosions at work. It requires employers to assess those risks and to eliminate or reduce them so far as is reasonably practicable, and to protect employees and other people who may be put at risk, such as visitors and members of the public. Since 2015, DSEAR also covers risks from gases under pressure and from substances that are corrosive to metals.2
That matters for energy storage because a BESS project is not only an electrical installation. Thermal, fire and explosion risks, and any dangerous substances present or liable to be present, have to sit inside the same risk assessment as the electrical work. HSE’s BESS page then isolates one communication duty that is easy to miss: under the Dangerous Substances (Notification and Marking of Sites) Regulations, if you are an operator of a BESS site which holds 25 tonnes or more of dangerous substances, you must notify your local fire and rescue service to inform their emergency response planning.1

What HSE says it does not decide
Planning permission for BESS is a matter for local planning authorities. Each nation in Great Britain has its own planning policy. HSE says it has a limited role in the planning process and should only be consulted on proposals that appear to fall within known consultation zones around major hazard establishments, major accident hazard pipelines or licensed explosives sites.1
Environmental issues, including whether a permit for emissions and discharges is required, are a matter for the environment departments of the UK government, the Scottish Government or the Welsh Government, not for HSE’s BESS health and safety page.1 Keep those processes separate, and do not treat a planning consent as proof that DSEAR, the Electricity at Work Regulations or the 25-tonne notification have been met.
Smaller lithium-ion cells and packs — the kind used in tools, stores and workshops — are not the subject of that grid-scale page. They still require a risk assessment under general health and safety law, including, where flammable or energetic events are reasonably foreseeable, the framework DSEAR already provides for dangerous substances.2 Do not copy a grid-scale emergency plan onto a cupboard of spare tool batteries, and do not ignore fire and electrical risk because the installation is “only” a few modules.
If you work outside Great Britain, follow your own regulator. The video below is an official film from SafeWork NSW, the work health and safety regulator in New South Wales, on lithium-ion battery safety. It is included as a regulator briefing, not as Great Britain law.

Want a structured walk-through of lithium-ion battery and energy storage hazards, with a knowledge check at the end? Our free course Lithium-ion Battery and Energy Storage Safety is built for that purpose. For the fire and emergency arrangements that sit alongside it, see Fire Safety & Emergency Preparedness. These are independent Academy courses, not official HSE awards, and they are not a substitute for complying with the regulations that apply to your site.
What usually goes wrong
Projects go wrong when a BESS is treated as only an electrical job, and DSEAR, construction duties and fire-service notification are left until after the containers are on site. They also go wrong when operators assume that planning permission or an environmental permit has already settled the health and safety risk assessment. HSE’s list of duties applies across the life cycle to designers, installers and operators — not only to the company that will one day own the compound.1
Frequently asked questions
Does HSE treat grid-scale BESS as needing a new battery-specific law?
No. HSE lists existing health and safety legislation that already applies to designers, installers and operators, and states that if you comply with those regulations you will manage the health and safety risks of BESS.
When must a BESS operator notify the fire and rescue service?
HSE states that under the Dangerous Substances (Notification and Marking of Sites) Regulations, an operator of a BESS site which holds 25 tonnes or more of dangerous substances must notify the local fire and rescue service to inform their emergency response planning.
Does the HSE BESS page also write the rules for small tool batteries?
No. That page is about grid-scale battery energy storage systems. Smaller cells and packs still need a risk assessment under general health and safety law, but you should not treat the grid-scale page as a cell-level code.
Are the Academy courses official HSE awards?
No. They are free, independent Academy courses, not official HSE awards, and they are not a substitute for complying with the regulations that apply to your site.
Sources
Every factual statement marked with a number links to the source below. Sources were retrieved on 22 November 2026; check the publisher for later revisions.